This project is a complete refurbishment of the park's 2 roofs to improve the thermal efficiency of the whole complex. To this end, the roof insulation between the 2 buildings has been improved, all the air conditioning has been replaced and the 3-layer cushions have been replaced by 5-layer ones with a thermal break profile.
TECHNICAL BASE
5-layer ETFE cushions have been installed on the existing structure without having to replace the base aluminium profile.
Of the 5 sheets, the 2 outer ones are screen-printed to achieve the customer's target FS.
In addition, the base profile did not need to be replaced, but it has been improved to eliminate the thermal bridge that existed around the perimeter of the cushions.
With this intervention, the U-value of the system has been improved from 2.7 W/(m².K) to 1.1 W/(m².K).
RELATED PROJECTS
Get inspired by tensile structure projects that create unique and eye-catching environments — spaces at the forefront of contemporary architecture.