The new Camp Clar sports stadium was built to hold the 18th Mediterranean Games. This sports arena has capacity for 5.000 people, and a textile false ceiling has been installed under the metallic structure of the cover. The membrane is fractioned into strips approximately 6m wide, following the modulation of the metallic substructure. The surface area of 4.494m² is composed of 44 tarpaulins.
TECHNICAL BASE
The project consists of installing a membrane roof. Form-finding and cutting-pattern design ensure that the membranes fit the geometry of the structure. The fabric used is a white mesh by Ferrari, reference FT381. The membranes are secured by perimeter lacing to a cable anchored to the metal structure. The elastic cord used is made of silicone, by Ferrari, reference Silcord.
RELATED PROJECTS
Get inspired by tensile structure projects that create unique and eye-catching environments — spaces at the forefront of contemporary architecture.